Friday, April 29, 2011

Status update!!!

THE TO DO LIST

M and 'D started detailing out the dance module today.  We got a rough schematic section showing how the mechanics work for the floor and figured out what we need to do for the design review sometime during week 7:

-a scale model of a module: 'D will look for materials over the weekend and bring them to class Monday.
-signage: M and A will figure that out Monday
-schematic drawing: H can start that on Monday

-We are thinking a full digital model (with all nine modules) would be good for the final review; H and 'D could start that when doing the schematic drawing but we'll figure all that out Monday :)

We should be able to get all this done during class time if we work efficiently!!!!!

LET'S GET HAM'D!!!!!!!



O.K. scratch all that, the professors have a different take on what we should have for the design review so we'll need to revise this :)  See you all Monday

Wednesday, April 27, 2011

Design Ideas



Here are our most recent design ideas. Drawn up by 'D himself. Sorry they are kind of hard to see.

Enjoy!