THE TO DO LIST
M and 'D started detailing out the dance module today. We got a rough schematic section showing how the mechanics work for the floor and figured out what we need to do for the design review sometime during week 7:
-a scale model of a module: 'D will look for materials over the weekend and bring them to class Monday.
-signage: M and A will figure that out Monday
-schematic drawing: H can start that on Monday
-We are thinking a full digital model (with all nine modules) would be good for the final review; H and 'D could start that when doing the schematic drawing but we'll figure all that out Monday :)
We should be able to get all this done during class time if we work efficiently!!!!!
LET'S GET HAM'D!!!!!!!
O.K. scratch all that, the professors have a different take on what we should have for the design review so we'll need to revise this :) See you all Monday
Friday, April 29, 2011
Wednesday, April 27, 2011
Design Ideas
Monday, April 25, 2011
Hamsterwheels!
Human power at the Coachella Music Festival!!
http://inhabitat.com/coachellas-human-powered-dj-booth-blasts-renewable-blips-and-bleeps/
Exploritorium bicycle generator
Exploritorium visit by Hannah. A bike connected to lights and fans so that you can generate the power yourself!!!
Subscribe to:
Posts (Atom)



