Friday, April 29, 2011

Status update!!!

THE TO DO LIST

M and 'D started detailing out the dance module today.  We got a rough schematic section showing how the mechanics work for the floor and figured out what we need to do for the design review sometime during week 7:

-a scale model of a module: 'D will look for materials over the weekend and bring them to class Monday.
-signage: M and A will figure that out Monday
-schematic drawing: H can start that on Monday

-We are thinking a full digital model (with all nine modules) would be good for the final review; H and 'D could start that when doing the schematic drawing but we'll figure all that out Monday :)

We should be able to get all this done during class time if we work efficiently!!!!!

LET'S GET HAM'D!!!!!!!



O.K. scratch all that, the professors have a different take on what we should have for the design review so we'll need to revise this :)  See you all Monday